Building shell is complete

Posted: Wed Dec 16, 2020 8:42 pm
by jordansparks
The shell of our new 8000 sf building is complete. It's now weatherproof and secure, interior framing is done, and landscaping is done. Progress will continue slowly over the next year or so. It will need heat, electricity, drywall, etc.

Re: Building shell is complete

Posted: Mon Jan 04, 2021 7:16 pm
by jordansparks
Sprinkler system is installed.

Re: Building shell is complete

Posted: Sat Apr 10, 2021 8:29 pm
by Mati_Roy
I'd be curious to see a picture :)

Re: Building shell is complete

Posted: Tue Jun 29, 2021 7:17 pm
by jordansparks
Electrical and plumbing rough-in are done. Drywall is underway. The 1500 L microbulk liquid nitrogen (LN2) tank has been ordered and will arrive soon. This tank is 8' tall and 4' in diameter, so it's not huge. We don't go through a lot of LN2, but it's essential that we always have it on hand and that it's reliable. It will be kept full by deliveries from a semitruck about once a month. It's higher pressure than the portable 200 L tanks that we currently get delivered, with a normal evaporation rate (NER) of 1% instead of 2.5%.

Re: Building shell is complete

Posted: Wed Sep 15, 2021 7:51 pm
by jordansparks
Roof top A/C units were craned into place yesterday.

Re: Building shell is complete

Posted: Sun Oct 03, 2021 8:03 am
by jordansparks
Door frames and suspended ceilings are done. All this finishing stuff always seems to drag out. I've asked the architect to draw a set of stairs and two upstairs RRs. That will give us another 3000 sf on the second floor. There are a few reasons for this. The primary reason is that much of the upstairs could be research space and/or light storage. Another reason is that it dramatically increases the appraised value so that I can get a bigger mortgage. But we will be able to move in prior to the construction of the stairs.